Start with a question. Follow the systems behind it. Examine the evidence and the
limits of what it can tell you.
The research is free to read and needs no registration. It describes systems and
evidence; it is not advice for a specific decision.
Illustration, not to scale
AI infrastructure
Power and cooling
What AI Is Made Of
What must exist before a gigawatt of AI computation can operate?
An interactive reference model of a hypothetical one-gigawatt AI data centre. Follow
its power and cooling systems, open the equipment and examine the assumptions behind
the material estimates.
For decisions about infrastructure exposure, dependencies and diligence.
Format
Interactive 3D model with a list view and a published research trail
Author
Sid Mofya
Scope
A hypothetical plant with one gigawatt of commissioned IT electrical capacity. Material figures are estimates for partial equipment scope.